Venture Laboratory

Run the CoE’s 100-day incubation cycle and turn the findings into a decision for each project.

How it works

  1. Scope the test

    Define the customer or stakeholder need, the assumption being tested, the baseline, a measurable target and what would stop the test.

  2. Design a bounded pilot

    Name the project lead, participants, permissions, budget, dependencies and evidence collection method. Decide how to handle errors, exceptions and possible bias.

  3. Run and review

    Compare results with the baseline and target. Track exceptions and corrective actions. Use control charts when enough comparable observations are available.

  4. Prepare the decision

    Summarize what the evidence supports, remaining risks and the resources required for the next stage. Recommend proceeding, extending, redesigning or closing.

What the center delivers

Test plan, baseline and targets, pilot evidence, issue log, cost record and next-stage recommendation.

Illustrative project application

For a dairy pilot, test one product against one buyer specification for one destination, measuring batch rejection, accepted deliveries and delivered margin.