INCUBATION / INSIGHT
Define what is worth testing
Research the need, compare alternatives, retain contradictory evidence and establish the entity, activity and measurement boundary.

SUSTENANCE IS EMPOWERMENT
AMNAYA / POLICY & OPERATING FRAMEWORK
Sixteen proposed policies connect venture building, responsible conduct and evidence-led reporting. Every principle has an owner, a routine, a record and a review.
A REFERENCE, NOT A REPLICA
Rocket Internet’s public approach combines incubation, investment and operational support. Amnaya adapts those broad ideas into a shared-services and evidence-gate model. The detailed controls below are original proposals; Rocket’s private policies and proprietary processes are not reproduced.
Rocket Internet’s public operating approach ↗INCUBATION / INSIGHT
Research the need, compare alternatives, retain contradictory evidence and establish the entity, activity and measurement boundary.
INVESTMENT / CHALLENGE
Expose cash needs, downside, conflicts and permissions. Reserve material capital and risk decisions to lawful authority.
OPERATIONAL SUPPORT / CAPABILITY
Share competent finance, technology, procurement and people support while retaining project-specific responsibility, IP and quality controls.
THE PROPOSED POLICY REGISTER
Expand a policy to see clauses, owners, routines, evidence, proposed indicators, critical holds and primary references. Internal targets are configurable Amnaya proposals, not numbers mandated by international standards.
16 proposed policies
Keep legal authority, owner decisions and independent scrutiny clear across a small team and a multi-project group.
Proposed owner: Entity governing body / policy coordinator
Review: Annual and after material change; quarterly implementation review
Effective date: not set
Inspired by public governance and oversight themes; Amnaya roles and reserved matters are proposed, not copied from Rocket Internet. S1/S2 governance disclosures may draw on these records when material and applicable.
Target mappings are contribution hypotheses, not verified achievements or UN indicators.
Build repeatable ventures with operational support, evidence gates and bounded capital at risk.
Proposed owner: Investment decision owner / venture lead
Review: Annual and after material change; quarterly implementation review
Effective date: not set
Rocket reference is limited to incubation, investment and operational support. The evidence tests, allocation limits and 100-day schedule are original Amnaya proposals. Target-level SDG contributions require project evidence.
Target mappings are contribution hypotheses, not verified achievements or UN indicators.
Make commercial conduct honest, competition fair and improper influence unacceptable.
Proposed owner: Compliance lead / independent reviewer
Review: Annual and after material change; quarterly implementation review
Effective date: not set
UNGC anti-corruption and OECD business-integrity/competition references inform the baseline. Amnaya screening workflows and monitoring targets are proposed controls, not regulator certifications.
Target mappings are contribution hypotheses, not verified achievements or UN indicators.
Respect people in own operations and value chains, with fair work, safety and access to remedy.
Proposed owner: People lead / site safety lead
Review: Annual and after material change; quarterly implementation review
Effective date: not set
ILO fundamental rights include safety/health following the 2022 amendment. SDG targets are impact references; internal workforce metrics do not substitute for national SDG indicators.
Target mappings are contribution hypotheses, not verified achievements or UN indicators.
Link intended benefits to measurable outcomes while preventing harm to people and ecosystems.
Proposed owner: Sustainability lead / project owner
Review: Annual and after material change; quarterly implementation review
Effective date: not set
Target-level UN SDG contribution mapping is proposed and distinct from IFRS financial materiality. National/global SDG indicators may be unsuitable as direct company KPIs; each internal proxy is labelled.
Target mappings are contribution hypotheses, not verified achievements or UN indicators.
Measure material climate exposures and develop a credible, financed response.
Proposed owner: Climate data owner / finance lead
Review: Annual and after material change; quarterly implementation review
Effective date: not set
IFRS S2 is a climate-related financial disclosure standard, not a carbon certification. December 2025 GHG amendments become effective for periods beginning 1 January 2027; early application requires the prescribed disclosure and an applicability/version assessment.
Target mappings are contribution hypotheses, not verified achievements or UN indicators.
Maintain reliable entity books, protected cash and a defensible reporting basis.
Proposed owner: Finance lead / governing body
Review: Annual and after material change; quarterly implementation review
Effective date: not set
IFRS Accounting Standards address financial statements. IFRS 18 replaces IAS 1 for periods beginning on/after 1 January 2027, with early application permitted; jurisdictional endorsement and entity scope must be assessed. This manual is not a full accounting-policy textbook.
Target mappings are contribution hypotheses, not verified achievements or UN indicators.
Prepare decision-useful sustainability information connected to financial reporting without overstating compliance.
Proposed owner: Finance lead / sustainability lead
Review: Annual and after material change; quarterly implementation review
Effective date: not set
Financial materiality under ISSB standards and wider SDG impacts are distinct assessments. S1/S2 are effective for annual periods beginning 1 January 2024, but actual obligations depend on jurisdiction/entity adoption. No adoption or assurance is asserted for Amnaya.
Target mappings are contribution hypotheses, not verified achievements or UN indicators.
Source fairly, strengthen supplier capability and control financial, rights and delivery risks.
Proposed owner: Procurement owner / independent approver
Review: Annual and after material change; quarterly implementation review
Effective date: not set
SDG 12.7 concerns public procurement; private supplier controls are an analogous contribution pathway, not a claim that a corporate KPI is the UN indicator. OECD risk-based diligence informs prioritisation.
Target mappings are contribution hypotheses, not verified achievements or UN indicators.
Protect personal, confidential and business-critical information through its lifecycle.
Proposed owner: Information owner / security lead
Review: Annual and after material change; quarterly implementation review
Effective date: not set
NIST CSF 2.0 provides a voluntary risk-management reference across six functions. This policy does not claim NIST certification or that MFA, malware scanning or other controls already exist on the current Amnaya platform.
Target mappings are contribution hypotheses, not verified achievements or UN indicators.
Use AI and new technologies where they serve a defined need with accountable human judgement.
Proposed owner: AI/product owner / independent risk reviewer
Review: Annual and after material change; quarterly implementation review
Effective date: not set
NIST AI RMF 1.0 is a voluntary reference, not a certificate or a claim of legal AI compliance. Local AI/product/privacy requirements need a separate applicability assessment.
Target mappings are contribution hypotheses, not verified achievements or UN indicators.
Prevent live activity before its quality, safety and legal basis is demonstrated.
Proposed owner: Sector technical lead / safety owner
Review: Annual and after material change; quarterly implementation review
Effective date: not set
Sector annexes are applicability questions, not exhaustive legal requirements. The shared 100-day model is a review framework; no generic policy substitutes for a regulator, clinician or qualified technical reviewer.
Target mappings are contribution hypotheses, not verified achievements or UN indicators.
Translate equitable development and modern resilience into lawful, evidence-led project decisions.
Proposed owner: Territory lead / commercial and legal reviewers
Review: Annual and after material change; quarterly implementation review
Effective date: not set
Historical NIEO aspirations and the 2024 Pact/digital cooperation context are clearly separated from binding local obligations. Proposed trade controls and economic participation metrics are Amnaya practices, not claims that international declarations bind every corporate transaction.
Target mappings are contribution hypotheses, not verified achievements or UN indicators.
Allow concerns to be heard safely and resolved fairly, without retaliation.
Proposed owner: Independent grievance owner / governing body
Review: Annual and after material change; quarterly implementation review
Effective date: not set
UNGP effectiveness principles inform the design. The existing public website enquiry form is not a verified anonymous/confidential whistleblowing service; a dedicated channel must be configured and tested before this proposed procedure goes live.
Target mappings are contribution hypotheses, not verified achievements or UN indicators.
Keep essential services safe through disruption and exit responsibly when continuation is unsound.
Proposed owner: Continuity owner / incident decision owner
Review: Annual and after material change; quarterly implementation review
Effective date: not set
Recovery objectives and exercise cadences are proposed operational controls. SDG resilience themes guide intended outcomes, not a claim that corporate exercises meet national SDG indicators.
Target mappings are contribution hypotheses, not verified achievements or UN indicators.
Turn policies into demonstrable practice and keep public assertions proportionate to evidence.
Proposed owner: Policy coordinator / independent assurance reviewer
Review: Annual and after material change; quarterly implementation review
Effective date: not set
Reference alignment does not establish UN affiliation, Global Compact participation, IFRS compliance, ISO/NIST certification or external assurance. The governance code and existing legal instruments must be reconciled before adoption; this draft does not amend them.
Target mappings are contribution hypotheses, not verified achievements or UN indicators.
No policies match these filters. Try another term, head or SDG.
INTERNATIONAL ALIGNMENT / DISTINCT LAYERS
Select relevant UN SDG targets and a measurable causal pathway. Assess human rights, labour, safety, water, waste and biodiversity harms as well as intended benefits. An internal metric is not automatically a UN indicator; positive impact does not cancel serious harm elsewhere.
References: UN SDGs, UN Global Compact principles, UNGPs, ILO and OECD responsible-business guidance. No affiliation or membership is implied.
Determine the entity’s statutory basis and any IFRS reporting obligations. Document recognition/measurement judgements, reconciliations, financial statements and actual audit status. IFRS 18 becomes effective for periods beginning 1 January 2027, subject to applicable adoption and early-application rules.
A policy manual is not an IFRS compliance statement. Local GAAP or Ind AS requirements may differ.
Connect governance, strategy, risk management and metrics/targets to the entity’s financial prospects. Assess reporting entity, period, value chain, relevant industry topics, data quality and current standard versions. Wider impacts and financial materiality remain separate assessments.
S1/S2 effective dates do not establish Amnaya’s obligation or compliance. December 2025 S2 GHG amendments are effective for periods beginning 1 January 2027; assess permitted early application and local rules.
1974 UN NIEO: a state-level development framework informing fair participation, local capability and transparent value-chain terms.
Today’s global economy: trade, FX, supply, finance, political, digital and technology risks assessed in the actual project context, with lawful diversification and responsible data/AI practices.
Neither creates a corporate “New World Economic Order” certification or an exemption from law.
IFRS S1/S2 are effective for annual periods beginning 1 January 2024; actual obligations depend on jurisdiction and adoption. IFRS 18 and December 2025 S2 GHG amendments have relevant 2027 effective dates. Each entity must record applicable versions, transition/early-application decisions and any reliefs. This is a proposed readiness framework, not a complete standards checklist.
FROM DRAFT TO OPERATING EVIDENCE
Use the seven-gate 100-day plan to assess, configure, rehearse, adopt and test. The timetable is relative to a separately authorised start. A checkbox never activates a policy.
DAYS 1-7
Map entities and actual decision rights; appoint coordinator and independent reviewer; identify critical permissions, immediate hazards and unverified public claims.
Evidence: Scope sheet, role/delegation draft, critical-hold register
Decision boundary: Do not create a new mandate or commit funds without existing lawful authority.
DAYS 8-21
Map people, suppliers, data, assets, reporting requirements and priority SDG targets; review material risks and stakeholder impacts.
Evidence: Entity/sector/territory annex, baseline and gap register
Decision boundary: Unresolved critical rights, safety, legal or confidentiality exposures retain a hold.
DAYS 22-42
Review policy clauses and numeric defaults; develop finance/disclosure memos, training, grievance channel and continuity plan; cost the implementation.
Evidence: Local annexes, configured thresholds, reviewer findings and resourced plan
Decision boundary: Independent review of technical, accounting and legal applicability before adoption recommendation.
DAYS 43-56
Test permission evidence, sample payments, restore/fallback, confidential intake and claims review; resolve critical design gaps.
Evidence: Rehearsal results and corrected version
Decision boundary: Governing body may adopt only the reviewed entity-specific version; record resolution, scope, effective date and conditions.
DAYS 57-70
Train affected people, communicate policies and execute approved controls; retain actual records and report exceptions.
Evidence: Acknowledgements, operating records and first management review
Decision boundary: Adoption is not proof of effectiveness; retain critical holds until verified.
DAYS 71-84
Sample high-risk commitments, data access and claims; challenge downside/continuity and verify remedial actions.
Evidence: Independent sample tests, exception and correction log
Decision boundary: No prohibited or expired exception; significant failures require a corrective owner decision.
DAYS 85-100
Review policy coverage, operating evidence, SDG/financial materiality distinctions and resource needs; publish only reviewed status.
Evidence: Day-100 review, residual-risk decisions and next review calendar
Decision boundary: Proceed, revise, hold or stop; no automatic claim of full standards compliance.
PROJECT & ENTITY ANNEX
Prepare a draft scope sheet for later review. This tool does not adopt policies, set an effective date, change authority or save private team records. Do not enter confidential information.
Unconfigured critical fields remain explicit: delegation limits, liquidity/runway floor, actual permissions, retention/notification clocks, recovery objectives, protected intake and materiality/reporting boundaries. A variance threshold is not an authority limit.
POLICY DOCUMENTS & EDITABLE REGISTERS
DRAFT v0.1 · 40 PAGES
Sixteen proposed policies with clauses, owners, practices, evidence, metrics and adoption boundaries.
DRAFT v0.1 · 10 PAGES
A phased 100-day adoption plan, review questions, configurable defaults and control testing.
DRAFT v0.1 · 6 PAGES
SDG target mapping, separate IFRS reporting layers and historical/current economic-order crosswalk.
All three PDFs, editable policy text, the complete framework JSON, five CSV registers and an entity configuration template.